X-CALIBR™ Project: Tokoroa Industrial Portal Building

X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building
X-CALIBR™ Project: Tokoroa Industrial Portal  Building

The requirements 

A private developer was keen to help grow Tokoroa, and wanted to build a high-quality industrial portal building to expand his portfolio. They needed the building to be cost effective, made to last and large - almost 1,000 sqm total.

The details 

  • Building dimensions: 44m long x 25m wide
  • Knee height: 5.4m
  • Portal installation time: Just over 4 hours
  • Products used: X-CALIBR™ rafters, columns, purlins, girts

How Central Steel Framing delivered 

Central Steel Framing (CFS) manufactured the building’s rafters, columns, purlins and girts using the X-CALIBRTM structural roll-formed system. The system’s design means it is as strong as structural steel while using significantly less raw material. The CSF team were also able to reduce labour costs by delivering completely prefabricated structural members - no need for drilling, cutting, welding or measuring.

The materials were trucked to the site, and the portal installation was completed in just over 4 hours with a crane and access lifting platform. Easy.