Covid Testing Cabins

Waitemata DHB, Silverdale, April/May 2020
 

During the 2020 Covid-19 lockdown, Central Steel Framing contributed to the current cause by providing steel framing for COVID testing cabins at the Waitemata DHB. The 4 testing units (8m and 9m cabins) were run at night in our workshop and assembled during the day by a different crew, ensuring we met the Covid-19 regulations. We are pleased to be helping out alongside Coastal Cabins Ltd.

RUN AT NIGHT AND ASSEMBLED THE NEXT DAY

The 4 testing units (8m and 9m cabins) were run at night in our workshop in Taupo, then delivered to the Waitemata DHB and assembled during the day by a different crew, ensuring we met the Covid-19 regulations.